Tongariro Access 10 Natural Flow
A10 river section at natural flow during the period of 22nd through to 31st. Genesis maintenance work will result in higher flows than usual on the Tongariro River for much of March. From Monday 22 March to Wednesday 31 March, the Poutu Tunnel and Canal will be inspected, affecting the flows downstream of Poutu Intake,...