Tongariro Access 10 Natural Flow March 22, 2021 @ 8:00 am - March 31, 2021 @ 5:00 pm A10 river section at natural flow during the period of 22nd through to 31st. Genesis maintenance work will result in higher flows than usual on the Tongariro River for much...
Wairoa River Recreational Water Release March 28, 2021 @ 10:00 am - 4:00 pm A controlled release of water into the Wairoa River will take place between 10am and 4pm. The Wairoa river near Tauranga is one of New Zealand’s best stretches of accessible...